Projects

Fire Extinguisher Project

Royal London Hospital – This was a complete installation into a new hospital building. Due to the size of the project the installation of fire extinguishers was phased during construction and prior to handover. Installation included service agreement for the annual maintenance in accordance with BS 5306.

 

Hose Reels Project

Burj Khalifa – This is the world’s tallest building. Hose reels manufactured by our Parent Company Moyne Roberts. Hose reels supplied to one of our agents in Dubai who arranged the installation of our products in this prestigious iconic building.
 

ICT Suppression System Project

Blackpool Victoria Hospital – This was a new installation of a gas suppression system to protect critical ICT server equipment for the trust. We obtained all the relevant information at the start of the project and designed the system based on its requirements and dimensions. We then saw the project through to completion installing the designed system which used the FM200 extinguishing medium. Upon completion the commissioning was completed and we now periodically maintain the system.
 

Local Automatic Extinguishant System Project

Customer required an extinguishant system to prevent minor fires in its production plant escalating into a total fire loss. It was agreed that a local automatic extinguishant system would be the best solution, this consists of a fire extinguisher cylinder filled with the required extinguishing medium. This then has a burst cable connected from the cylinder which passes through plant equipment switchgear risk areas. This fire cable will then burst when exposed to its operating release heat temperature and then discharges locally to the fire incident area to extinguish. HFC 236 extinguishing medium was selected for this project.
 

 

Achilles Construction Line FIA The British Fire Consortium BAFE Chas ISO 14001 ISO 9001 The Consortium Fire and Rescue Investors in People Safe Contractor Bafe SP05 Bafe SP05 Bafe SP05

 

Mobile Site